POWER FOR DATA CENTERS
Make data centers the model of environmental stewardship, reduce lead-times, CapEx and OpEx all at the same time by powering data centers with fuel cells running on hydrogen from OneSix Energy.
Eliminate public concerns and lead-time to being operational
The headwinds for building new data centers are numerous. Grid interconnection lead time is on the order of 5 years. A wary public is showing up at planning meetings in force complaining about increased stress on the electrical grid, enormous amounts of fresh water used for cooling, and environmental/climate impact due to increased carbon emissions. To allay their concerns about the grid, dedicated gas-powered turbines are an option, but that doesn’t address the concerns over water, nor the carbon emissions. Further, the lead-time for gas turbines is also 5 years.
Benefits of installing a OneSix system
10%
lower cap-ex
10%
lower op-ex
47
months earlier start of operation
88%
reduction in water use
97%
reduction in carbon emissions